Maharashtra
-
202
Consumers installed Rooftop Solar
-
0.804
Capacity Installed(MW)
-
25
Ongoing Tender (MW)
-
49
Events Organised
-
Key Highlights MSEDCL Residential Rooftop Solar
-
Last date to apply - 1st Jan 2022
DISCOM Contact Details
Maharashtra State Electricity Distribution Co. Ltd. (MSEDCL)
- Prakashgad, Plot No. G-9,
Anant Kanekar Marg Bandra (E),
Mumbai–400051 - Toll Free: 1800-102-3435 / 1800-233-3435
- support_solarrf@mahadiscom.in
DISCOM Contact Details
Tata Power
- Bombay House, 24,
Homi Mody Street,
Mumbai - 400 001 - Toll Free: 18002095161
- customercare@tatapower.com
DISCOM Contact Details
Adani Electricity Mumbai Limited (AEML)
- Adani Electricity, Devidas Lane,
Off SVP Road, Near Devidas Lane,
Telephone Exchange, Borivali (W),
Mumbai - 400103 - Toll Free: 19122
- helpdesk.mumbaielectricity@adani.com
DISCOM Contact Details
BEST
- 1st Floor, Electric House,
BEST Marg, Colaba,
Mumbai 400001 - Toll Free: -
- derc@bestundertaking.com
-
Apply for rooftop solar
-
Want to install Rooftop solar?
Apply Now -
Need more assistance
Connect with Volunteer -
know your solar rooftop capacity and benefits
Solar Calculator -
Know more about solar rooftop
Resources
-
Upcoming Events
No Upcoming Events...
Vendor will be responsible for operation and maintenance of project for 5 years.
Consumer will submit the solar rooftop application from in DISCOM portal and choose the preferred empanelled vendor for installation.
Empanelled vendor list DISCOM online portalDISCOM will install the Solar Rooftop project at consumer roof and synchronize the project with DISCOM.
- Empanelled vendor and DISCOM will analyse the feasibility of Solar Rooftop system
- Empanelled vendor will apply for Net Meter from DISCOM, on behalf of consumer
- Empanelled vendor will commence installation of plant by empanelled vendor
Rooftop solar Installation Activities
Consumer
- Submission of Solar Rooftop application in DISCOM portal
- Selection of vendor from the list of empanelled vendors
- Applying for Net Meter in DISCOM
- Payment of rooftop system instalment along with application and metering charges
- Co-ordinate with vendor for system installation
- Collect all the necessary documents from the installer
- Signing Joint Inspection Report during plant commissioning
Vendor
- Coordinating and assisting consumer for application submission in portal
- Feasibility analysis of Solar Rooftop in consumer roof
- Installation of Solar Rooftop plant as per the DISCOM specifications
- Testing and commissioning of plant as per DISCOM guidelines
- Signing Joint Inspection Report after plant commissioning
- Undertaking operation and maintenance of project for 5 years post commissioning
DISCOM
- Provide checklist of documents required for consumer application
- Undertake technical feasibility of consumer application
- Scrutinization of application documents
- Testing, the Solar Rooftop Project and ensuring compliance of grid interconnection and safety standards.
- Signing Joint Inspection Report after plant commissioning
I-SMART (Indian Solar Market Aggregation for Rooftops) is a demand aggregation platform aimed at reaching out to residential consumers and increasing their awareness for Solar Rooftop Technology. The program is promoted by GIZ and MNRE.
Discovered Rates
Categories | Rate (Rs./Watt) |
---|---|
1 kW | 46.82 |
Above 1-2 kW | 42.47 |
Above 2-3 kW | 41.38 |
Above 3-10 kW | 40.29 |
Above 10 kW & upto 100 kW (Including GHS and RWA) | 37.02 |
Solar Calculator
Know Your Solar Rooftop Capacity And Benefits.
-
Maharashtra
-
Punjab
-
Uttar Pradesh
-
West Bengal
-
Gujarat
Rooftop Area (sqft)
Average Monthly Electricity Bill (₹)
Solar Calculator Result
-
Uttar Pradesh
-
320
Rooftop Area (sqft)
-
320
Monthly Bill (₹)
Results
-
Size of RTS plant installed upto
XXXX
kW
Considering 1 kW system can be installed on 100 sq.ft roof area -
Cost of System
XXXX
Rs
Estimated basis discovered rates of DISCOM excluding subsidy
Includes central govt.subsidy as per MNRE phase-II guidelines and additional UP state govt. subsidy
-
Monthly generation
XXXX
kWh
Considering 4 units per day generation from 1 kW system -
Monthly saving
XXXX
Rs
Monthly savings exclude fixed charges, taxes, duties, cess and other misc charges -
Annual CO2 Offset
XXXX
KG
Considering reduction of CO2 emission per 1 kWh of solar power equals 0.82 kg of CO2 per year
Disclaimer: The calculation is indicative in nature. Generation may vary from location to location.
Ask Volunteer to Contact You
Discovered Rates
Capacity Range | Rate (Rs / kW) |
---|---|
1 kW | Rs 46820 |
More than 1-2 kW | Rs 42470 |
More than 2-3 kW | Rs 41380 |
More than 3-10 kW | Rs 40290 |
More than 10 kW to upto 100 kW | Rs 37020 |